100% Kiwi owned & operated

All orders ship from our NZ warehouse

Use 'FREESHIP' code for free shipping on orders over $200 (excludes bulky/heavy items & rural deliveries).

FREESHIP
SKU: PR888832

Hornby Trains & Accessories - GNER Mk3 Trailer First

$187.00
GNER Mk3 Trailer First
HOR R40431 Hornby GNER, Mk3 Trailer First (TF), 41044 - Era 9 2024 Catalogue

To allow running at 125mph on Britain's Victorian railways, British Railways needed new rolling stock. Significant improvements of the Mk2 included new secondary air suspension between the bogies and the coach body as well as aerodynamic skirting on the underframe.
Mk3 coaches are 75ft (23m) long, enabling far greater capacity than older coaches. Mk3 coaches also incorporate disk brakes and wheel-slip protection for faster deceleration. The first Mk3 coaches delivered were used as part of the HST prototype along with the two Class 41 diesel power cars in 1972. Mk3 coaches entered service in 1975 along with the Class 43 forming the iconic InterCity 125 trainset.
After the HST Mk3 coach variant was introduced, further Mk3 coaches were sent to the West Coast Mainline for use as part of locomotive-hauled trains. Whilst Mk3 stock is standard for HST units, the standard locomotive-hauled stock is Mk3a.
Mk3a stock differs from Mk3 stock due to the inclusion of buffers as well as a different electrical system that uses motor generator units in each coach to power air conditioning and other ancillaries. Mk3a stock was built until 1984 before 3B stock, with improved seating and lighting, was built from 1985 to 1988.
The Office for Passenger Rail Franchising (OPRAF) announced that GNER had won the Inter City East Coast franchise in March 1996. Through this, GNER inherited a fleet of InterCity 125 HST sets and rolling stock such as the BR-built Mk3 coaches. The Mk3 coaches were in service from 28th April 1996 when the GNER started operating its new fleet.
In August 1997, GNER acquired twelve Mk3 sleeping coaches for conversion to passenger coaches to make the HSTs longer. The project was not to be, as GNER was able to lease other Mk3 coaches released by Virgin CrossCountry after the operator withdrew its HSTs. By the time that GNER’s services were transferred to National Exp

Delivery Information

All of our products are stocked in New Zealand, and shipped from our Auckland warehouse, this means no unexpected import fees or taxes.

Payment & Security

Payment methods

  • American Express
  • Apple Pay
  • Google Pay
  • Mastercard
  • PayPal
  • Shop Pay
  • Union Pay
  • Visa

Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.

TOY MOD

Hornby Trains & Accessories - GNER Mk3 Trailer First

$187.00
GNER Mk3 Trailer First
HOR R40431 Hornby GNER, Mk3 Trailer First (TF), 41044 - Era 9 2024 Catalogue

To allow running at 125mph on Britain's Victorian railways, British Railways needed new rolling stock. Significant improvements of the Mk2 included new secondary air suspension between the bogies and the coach body as well as aerodynamic skirting on the underframe.
Mk3 coaches are 75ft (23m) long, enabling far greater capacity than older coaches. Mk3 coaches also incorporate disk brakes and wheel-slip protection for faster deceleration. The first Mk3 coaches delivered were used as part of the HST prototype along with the two Class 41 diesel power cars in 1972. Mk3 coaches entered service in 1975 along with the Class 43 forming the iconic InterCity 125 trainset.
After the HST Mk3 coach variant was introduced, further Mk3 coaches were sent to the West Coast Mainline for use as part of locomotive-hauled trains. Whilst Mk3 stock is standard for HST units, the standard locomotive-hauled stock is Mk3a.
Mk3a stock differs from Mk3 stock due to the inclusion of buffers as well as a different electrical system that uses motor generator units in each coach to power air conditioning and other ancillaries. Mk3a stock was built until 1984 before 3B stock, with improved seating and lighting, was built from 1985 to 1988.
The Office for Passenger Rail Franchising (OPRAF) announced that GNER had won the Inter City East Coast franchise in March 1996. Through this, GNER inherited a fleet of InterCity 125 HST sets and rolling stock such as the BR-built Mk3 coaches. The Mk3 coaches were in service from 28th April 1996 when the GNER started operating its new fleet.
In August 1997, GNER acquired twelve Mk3 sleeping coaches for conversion to passenger coaches to make the HSTs longer. The project was not to be, as GNER was able to lease other Mk3 coaches released by Virgin CrossCountry after the operator withdrew its HSTs. By the time that GNER’s services were transferred to National Exp

Default

  • Default
View product