Hornby Train Accessory - BBR Bulleid 59' CorrIDOR Brake 3rd
Hornby BR, Bulleid 59' Corridor Brake Third, S2850S - Era 4
In 1938, with the assistance of his Technical Assistant, L. Lynes, Bulleid began design work for new steam-hauled stock for the Bournemouth and Weymouth services, placing the order for fifty-four 57' 11" underframes with Lancing Works. Featuring a smooth, continuously curved bodyside, with small fixed windows above the door windows, the exterior was distinctly Bulleid in character and was a perfect match for his streamlined Pacifics and Light Pacifics. However, the interim nature of the design was apparent in the retention of Maunsell's underframe and layout, with side doors providing access to each compartment. Two types of stock were built; a Composite of four First, and three
Delivery Information
Delivery Information
All of our products are stocked in New Zealand, and shipped from our Auckland warehouse. Therefore, there are no unexpected import costs or delivery delays.
Payment & Security
Payment methods
Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.